How to Use This Blog

Please scan though the postings and if you desire to comment please do. On the lower left side you will find a listing of all the postings broken down into year and month. If you select a year the entire posts from that year will be available for your viewing. If you desire to enlarge any picture -- just double click the given picture embedded within the text for better viewing.

Monday, December 10, 2012

5's Bathroom Walking Path

Pumping Concrete to the Top Half of the Walkway
Today is the big pour of the walkway going from 5's tee to the bathroom and down to the road.  This project has been planned for years but with the HOA working on installing a new wall along Sweetwater it finally came to fruition.
Virginio Stomps Down the Wire Mesh for the Walkway
This will be a nice addition to the golf course and will look so much better than the old gravel walkway.  Additionally, this morning we are fertilizing the greens and with the cooling weather getting ready to finally cutback the water.
11's Green 12-10-12
Tree trimming is nearly a conclusion and looks great.  By Wednesday the project will be finished. This trimming not only reduces the weight in the branches of the trees but also allows light to reach the turf.
3+ Foot Hive of Bees About 25 Feet from the Ground
A word of caution ... on the right side of 11 along the property line there is a quite large hive of bees.  We discovered them as we were trimming and will shortly have them removed.  So far no one has seemed to notice them but still they can be dangerous.


No comments:

Post a Comment