Please scan though the postings and if you desire to comment please do. On the lower left side you will find a listing of all the postings broken down into year and month. If you select a year the entire posts from that year will be available for your viewing. If you desire to enlarge any picture -- just double click the given picture embedded within the text for better viewing.

Wednesday, June 6, 2012

Bunker Work on 4

4's Left Front Greenside Bunker
Today we started the bunker repair and removal process on hole number 4.  The problematic front left bunker that has always sloped towards the green was reshaped and leveled - finishing work will be done tomorrow.
Work Begins on the Bunker
The work included removal of the "hump" from back when the sand pro use to be used and the sand build up from the exiting of the unit.  Additionally, we had to expand the bunker thus further removing the build up of sand from the sand pro as well.
Reshaped and Hump Removed -- Now Working on Leveling
After removing the sand it was place into the back greenside bunker on 4 as part of the removal process of that bunker per the design changes that were suggested and approved.
Leveling Continues

Filling In Getting Ready for Reshape -- Grass Chunks Will Be Removed
When all is said and done ... hopefully by tomorrow, these areas will be more playable and enjoyable to our members.  The next hole we will be working will be hole 2.  All these areas and bunkers will be roped and considered GUR until the ropes are removed.