How to Use This Blog

Please scan though the postings and if you desire to comment please do. On the lower left side you will find a listing of all the postings broken down into year and month. If you select a year the entire posts from that year will be available for your viewing. If you desire to enlarge any picture -- just double click the given picture embedded within the text for better viewing.

Friday, January 13, 2012

Bunker Testing & New Rake

This morning we had some issues with the new rake thanks to our high organic matter and fines sand in the bunkers.  We were finally able to smooth the wet sand but it was taking twice as long as it should ... we will be testing other rakes soon.
4's Right Front Greenside Bunker Rake with New Rake
Additionally, being slightly behind thanks to a two and half hour frost delay we got started on the test bunkers.  !0's test bunker, front right, we tilled deeply, watered in and smooth and is already back open for play.
10's Right Front Greenside Bunker After TIlling

10's Right Front Greenside Bunker Upon Completion
10's bunker is so soft it is difficult to smooth out and will take a couple irrigation cycles to become smooth again.  We also added sand to the front right bunker on 12 but sadly this sand that we had was full rocks and took a while to clean ... it will be back open for play today at the end of the maintenance team's shift.
12's Right Front Greenside Bunker After Having Blow Sand Added
The last test bunker located on 11's left side front of the green will take a bit longer to complete.  Due to sod being added it hopefully will be completed today and will be GUR for at least another week after.
11's Front Left Greenside Bunker Marked and Ready to Go

Soil Line Dropped on 11's Greenside Bunker

No comments:

Post a Comment