Please scan though the postings and if you desire to comment please do. On the lower left side you will find a listing of all the postings broken down into year and month. If you select a year the entire posts from that year will be available for your viewing. If you desire to enlarge any picture -- just double click the given picture embedded within the text for better viewing.

Monday, June 11, 2012

Aerification of the roughs started on 14 working backwards today.  This is quite a large process and will require most if not all week to complete.  A little later as the first assignments of the day are completed we will have the rough units out chopping up the plugs making the conditions more favorable to our members.  Additionally, today we have started the triplexing of the greens which will free up staff to address other summer issues.
2's Front Right Bunker is Almost Complete
The humps have been removed from 2's greenside bunkers ... or at least the ones that we needed removed to produce enough sand to remove the back right bunker.  Sodding will be finished today.
Adrian Velez Leveling the Bunker That is Being Removed
After we finish 2's bunkers we will be going to hole 6 and start working on them.  The removal of the back bunker of 6 is going to required quite a bit of soil so we may be also addressing 9's greenside, and maybe even 7's greenside bunkers to produce the soil required.   Our goal this week is to finish 6 and which ever holes to obtain the soil from.
Victor Torres Leveling the Front of the Bunker After Hump Removal
After this week the project will be put on hold until aerification and fertilization's are completed.