After well over a month of missing a pump station pump yesterday we finally got the new one installed. After install we have allowed the station to run last night at reduced capacity to ensure it is fully operational and then this evening we will push it back up to full speed. It will be nice to have everything working correctly again.
Finally getting a chance to work on detail as well this week. With all of the projects and repairs of this summer we haven't been keeping the detail at the level I like it ... i.e. edging and weed eating. Now we are working on those detail item again and hopefully soon will be 100% caught back up ... provided that this high humidity backs soon.
Thanks to the increased levels of temperature and humidity we have been heavily focusing on getting the the roughs mowed on a heavy rotation. Some to most of the roughs thanks to taking only four days to get back to required a double mowing to produce a smooth product ... I haven't seen that level of growth since I have been in the Valley.
No comments:
Post a Comment